Our new room category:

"Alpine Historic" - new from winter 2018

Since the end of the last winter season we have been working on two new rooms in the historical part of the building, with great support from good friends. We produced lots of dust, dirt and sweat and 18 tons of demolition material! But now we are glad to say that we have breathed new life into the old walls. The rooms were fitted in the autumn, and the rooms have been ready for occupation since Christmas.

Impression of the construction period

Demolition of the existing staff rooms

Exposing the building structure

New construction of the inner walls

Installation of the new windows

Insulation, plaster ceiling and underfloor installation

Joints for wet areas, underfloor heating

Drill hole for exhaust air, water connection, well-deserved break

Furniture and wooden floor installation