Our new room category:

"Alpine Historic" - new winter 2018

With great support from good friends we have been working on two new rooms in the historical part of the building,  We produced lots of dust, dirt and sweat and 18 tons of demolition material! But now we are glad to say that we have breathed new life into the old walls.

Impression of the construction period

Demolition of the existing staff rooms

Exposing the building structure

New construction of the inner walls

Installation of the new windows

Insulation, plaster ceiling and underfloor installation

Joints for wet areas, underfloor heating

Drill hole for exhaust air, water connection, well-deserved break

Furniture and wooden floor installation